2008 - 2017 Capital Improvement Program

 

Project #8060, Interceptor 1-MN-320 Reconnection & Rehab.  

Description:

This project involves the reconnection of some local Minneapolis sewers. This project was originally included as part of the Minneapolis 1-MN-320 Improvements project. Alternatives to the original design are being evaluated by the City of Minneapolis and the Metropolitan Council. Access to upstream sewer capacity problems in Interceptors 1-GV-460 and 1-GV-461 are also being studied as part of this project. The project also includes the construction of a new access shaft and crown repair to a section of Interceptor 1-MN-320.

 

Purpose and Justification:

To correct uncovered weakness and problem areas in the pipe to avoid potential collapses and the costs associated with their required emergency repairs. In addition, the improvements are being made in conjunction with the City of Minneapolis' Near Northside Redevelopment project. This joint project effort results in some added savings.

return to top

Project Authorization:

Project Schedule

Authorizations

Start

End

Funding

Status

Prelim. Engr.

Jan-06 Dec -07

$150,000

Approved

Design

Oct-06 Dec-07

$350,000

Approved

Construction

Jan-08 Dec-09

$3,800,000

Approved

Prior Authorization:

$4,300,000

2008 Budget Adjustment:

$0

Total 2008 Authorization:

$4,300,000

Future Authorizations:

$0

Total Project Cost:

$4,300,000

return to top

   Projected Cash Flow:

Authorized

Future

Total

Prior to 2008
$529,000
$0
$529,000
2008 Budget
2,000,000
0
2,000,000
2009
1,700,000
0
1,700,000
2010
0
0
0
2011
0
0
0
2012
0
0
0
2013
0
0
0
2014
0
0
0
2015
0
0
0
2016
0
0
0
2017
0
0
0
Post-2017
0
0
0
Contingency
71,000
0
71,000
Totals
$4,300,000
$0
$4,300,000

return to top

Impact on O&M Costs:

The impact to O&M costs are negligible.

return to top

 

 