2008 - 2017 Capital Improvement Program

Project #8054, Edina-Richfield Area Improvements  

Description:

The capacity of interceptor 1-RF-491 serving portions of Edina and Richfield will be exceeded in the   future. The projected increase in flow is primarily due to a higher density redevelopment  trend  along the I-494 corridor in Edina and Richfield. A relief sewer to off-load interceptor 1-RF-491  will  be constructed. It will consist of a new gravity interceptor, approximately 21,000 lineal  feet (LF) in  length with an estimated pipe diameter of 36-inches. The project also includes  relocating a portion  of existing interceptor 1-RF-491 that will be affected by MnDOT’s bridge project  at I35W and 76 th  Street.

Project Map

Click here to view the project's location map

Purpose and Justification:

This project addresses the reliability, redundancy, and capacity in the gravity interceptors within the Edina/Richfield service area. This project is being driven by redevelopment in the I-494 corridor and Southdale areas. The existing interceptors are operating near capacity. Edina and Richfield have presented preliminary redevelopment proposals, which are generally consistent with Council policy.

return to top

 

Project Authorization:

Project Schedule

Authorizations

Start

End

Funding

Status

Prelim. Engr.

Jan-06 Nov-07
$300,000
Approved

Design

Dec-07 Feb-09
$1,200,000
Approved

Construction

Mar-08 Dec-13

$28,500,000

Approved

Prior Authorization:

$7,000,000

2008 Budget Adjustment:

$0

Total 2008 Authorization:

$7,000,000

Future Authorizations:

$23,000,000

Total Project Cost:

$30,000,000

return to top

   Projected Cash Flow:

Authorized

Future

Total

Prior to 2008
$300,000
$0
$300,000
2008 Budget
  4,600,000
0
4,600,000
2009
2,000,000
4,000,000
6,000,000
2010
0
7,000,000
7,000,000
2011
0
4,000,000
4,000,000
2012
0
4,000,000
4,000,000
2013
0
4,000,000
4,000,000
2014
0
0
0
2015
0
0
0
2016
0
0
0
2017
0
0
0
Post-2017
0
0
0
Contingency
100,000
0
100,000
Totals
$7,000,000
$23,000,000
$30,000,000

return to top

Impact on O&M Costs:

This project will have some impact on O&M costs if pumping is required.

return to top

 

 

© 2008 Metropolitan Council. All Rights Reserved. · 390 Robert St. N., St. Paul, MN 55101 · Phone: 651-602-1000 · TTY: 651-291-0904