Description: This project consists of the CCTV internal inspection of both of the forcemains that serve the Plymouth lift station. The inspection and preliminary engineering will determine the extent of the forcemain that needs to be rehabilitate or replaced. |
The Plymouth lift station is served by two forcemains. The 30 inch forcemain was constructed in 1970 along with the pump station. In the late 1980's a 36 - 42 inch forcemain was installed to handle all the flow from the pump station. Portions of the Plymouth Forcemain act as a gravity sewer and never flow full. These portions of the forcemain experience are severely deteriorated by hydrogen sulfide. In order to meet the current and future needs of the service area, the forcemain requires rehabilitation or replacement.
Project Schedule |
Authorizations |
|||
Start |
End |
Funding |
Status |
|
Prelim. Engr. |
Jan-05 | Mar-06 | $230,000 |
Approved |
Design |
Jun-06 | May-07 | $365,000 |
Approved |
Construction |
Jun-07 | Jun-09 | $4,405,000 |
Approved |
Prior Authorization: |
$5,000,000 |
|||
2008 Budget Adjustment: |
$0 |
|||
Total 2008 Authorization: |
$5,000,000 |
|||
Future Authorizations: |
$0 |
|||
Total Project Cost: |
$5,000,000 |
|||
Authorized |
Future |
Total |
|
Prior to 2008 |
$231,000 |
$0 |
$231,000 |
2008 Budget |
2,000,000 |
0 |
2,000,000 |
2009 |
2,000,000 |
0 |
2,000,000 |
2010 |
0 |
0 |
0 |
2011 |
0 |
0 |
0 |
2012 |
0 |
0 |
0 |
2013 |
0 |
0 |
0 |
2014 |
0 |
0 |
0 |
2015 |
0 |
0 |
0 |
2016 |
0 |
0 |
0 |
2017 |
0 |
0 |
0 |
Post-2017 |
0 |
0 |
0 |
Contingency |
769,000 |
0 |
769,000 |
Totals |
$5,000,000 |
$0 |
$5,000,000 |
The impact will generally be minor due to the rehabilitation nature of the project.