| Project #8035, Interceptor System Standby Power Improvements | |
Description: The MCES currently owns and operates 63 pump stations. Stationary generator sets are located at 34 of the pump stations. In addition there are another 25 portable generator sets located throughout the system. This project includes the replacement of the generator sets that have reached the end of their useful life or have significant maintenance problems. |
Most generator sets used for back-up power at pump stations have exceeded their useful life expectancy of 25 years. In recent years the reliability of these generator sets has become a concern as there has been increased failures as well as increased maintenance required on the lift station generator sets. Failure of a generator sets in time of need could result in sewage overflow and basement backups throughout the system. Also during periods of high power demand, the MCES utilizes these generators at the lift stations in lieu of taking power from the grid per agreement with the power company. The MCES is penalized if generator power can not be used at these sites during peak power demands.
Project Schedule |
Authorizations |
|||
Start |
End |
Funding |
Status |
|
Prelim. Engr. |
Jan-04 | Apr-04 | $50,000 |
Approved |
Design |
May-04 | Mar-06 | $500,000 |
Approved |
Construction |
May-06 | Dec-09 | $9,050,000 |
Approved |
Prior Authorization: |
$9,600,000 |
|||
2008 Budget Adjustment: |
$0 |
|||
Total 2008 Authorization: |
$9,600,000 |
|||
Future Authorizations: |
$0 |
|||
Total Project Cost: |
$9,600,000 |
|||
Authorized |
Future |
Total |
|
Prior to 2008 |
$6,357,000 |
$0 |
$6,357,000 |
2008 Budget |
3,000,000 |
0 |
3,000,000 |
2009 |
200,000 |
0 |
200,000 |
2010 |
0 |
0 |
0 |
2011 |
0 |
0 |
0 |
2012 |
0 |
0 |
0 |
2013 |
0 |
0 |
0 |
2014 |
0 |
0 |
0 |
2015 |
0 |
0 |
0 |
2016 |
0 |
0 |
0 |
2017 |
0 |
0 |
0 |
Post-2017 |
0 |
0 |
0 |
Contingency |
43,000 |
0 |
43,000 |
Totals |
$9,600,000 |
$0 |
$9,600,000 |
This project will reduce the corrective
maintenance required to keep the existing generator sets operable.
New generator sets should also be more efficient, quieter, and should
use less fuel.