2008 - 2017 Capital Improvement Program

Project #8025, Riverview Siphon (SP-230)  

Description:

The project consists of improvements to the existing three-barrel Riverview Siphon (1-SP-230).   The siphon extends from the siphon inlet at intersection of Wabasha St and Isabel St. (river bluff)   along Wabasha St. under the Mississippi River across Raspberry Island terminating at the east   bluff  near Shepard Road. The proposed project consists of the replacement of the inlet structure   and the siphon barrels between the inlet and the west bank of the river. The project will also   renovate the siphon barrels beneath the river.

 

Project Map

Click here to view the project's location map

Purpose and Justification:

The siphon was constructed in the 1930's. The original pipe beneath the river was replaced in 1978. The original piping beneath the river was abandoned. The inlet structure and siphon barrels built in the 1930's are at the end of their useful life.

return to top

Project Authorization:

Project Schedule

Authorizations

Start

End

Funding

Status

Prelim. Engr.

Jan-03
Aug-04

$200,000

Approved

Design

Jun-04
Sep-07
$1,800,000

Approved

Construction

Jan-07
Dec-09

$8,000,000

Approved

Prior Authorization:

$10,000,000

2008 Budget Adjustment:

$0

Total 2008 Authorization:

$10,000,000

Future Authorizations:

$0

Total Project Cost:

$10,000,000

return to top

   Projected Cash Flow:

Authorized

Future

Total

Prior to 2008
$2,308,000
$0
$2,308,000
2008 Budget
  5,000,000
0
5,000,000
2009
2,400,000
0
2,400,000
2010
0
0
0
2011
0
0
0
2012
0
0
0
2013
0
0
0
2014
0
0
0
2015
0
0
0
2016
0
0
0
2017
0
0
0
Post-2017
0
0
0
Contingency
292,000
0
292,000
Totals
$10,000,000
$0
$10,000,000

return to top

Impact on O&M Costs:

Impact generally minor due to the rehabilitation nature of the project.