| Project #8022, Lift Station L-12 Improvements | |
Description: This project provides for the construction of a field-fabricated submersible type four-pump lift station located approximately 300-feet north of the existing L-12 site. The new lift station will have a rectangular split wet well and a valve vault. A superstructure will house a control room, emergency generator, ventilation, heating, and sanitary facilities. One hour of emergency storage at the average flow will be made available by upsizing the 300-linear feet of inlet gravity sewer to 90-inch diameter. The lift station will discharge into a new 16-inch diameter forcemain. The existing forcemain will be cleaned, inspected, and remain in service as a redundant barrel. The existing lift station will be demolished when the new station becomes operational. |
Located in St. Paul on Point Douglas Road, the existing Lift Station L-12 is a manufactured-type station with a capacity of 7.8 MGD. The lift station equipment is old and obsolete, and at the end of its useful life. The project will replace the existing lift station with a reliable efficient facility.
Project Schedule |
Authorizations |
|||
Start |
End |
Funding |
Status |
|
Prelim. Engr. |
Oct-03 | Jan-06 |
$125,000 |
Approved |
Design |
Feb-06 | Jan-07 |
$255,000 |
Approved |
Construction |
Feb-07 | Dec-09 |
$4,120,000 |
Future |
Prior Authorization: |
$4,500,000 |
|||
2008 Budget Adjustment: |
$0 |
|||
Total 2008 Authorization: |
$4,500,000 |
|||
Future Authorizations: |
$0 |
|||
Total Project Cost: |
$4,500,000 |
|||
Authorized |
Future |
Total |
|
Prior to 2008 |
$1,026,000 |
$0 |
$1,026,000 |
2008 Budget |
2,000,000 |
0 |
2,000,000 |
2009 |
500,000 |
0 |
500,000 |
2010 |
0 |
0 |
0 |
2011 |
0 |
0 |
0 |
2012 |
0 |
0 |
0 |
2013 |
0 |
0 |
0 |
2014 |
0 |
0 |
0 |
2015 |
0 |
0 |
0 |
2016 |
0 |
0 |
0 |
2017 |
0 |
0 |
0 |
Post-2017 |
0 |
0 |
0 |
Contingency |
974,000 |
0 |
974,000 |
Totals |
$4,500,000 |
$0 |
$4,500,000 |
No significant increase to annual budget anticipated. The annual operation and maintenance cost for the replacement lift station is estimated at $77,000.