2008 - 2017 Capital Improvement Program

Project #8022, Lift Station L-12 Improvements  

Description:

This project provides for the construction of a field-fabricated submersible type four-pump lift   station located approximately 300-feet north of the existing L-12 site. The new lift station will have   a rectangular split wet well and a valve vault. A superstructure will house a control room,  emergency generator, ventilation, heating, and sanitary facilities. One hour of emergency storage   at the average flow will be made available by upsizing the 300-linear feet of inlet gravity sewer to   90-inch diameter. The lift station will discharge into a new 16-inch diameter forcemain. The   existing  forcemain will be cleaned, inspected, and remain in service as a redundant barrel. The   existing lift station will be demolished when the new station becomes operational.

Project Map

Click here to view the project's location map

Purpose and Justification:

Located in St. Paul on Point Douglas Road, the existing Lift Station L-12 is a manufactured-type station with a capacity of 7.8 MGD. The lift station equipment is old and obsolete, and at the end of its useful life. The project will replace the existing lift station with a reliable efficient facility.

return to top

Project Authorization:

Project Schedule

Authorizations

Start

End

Funding

Status

Prelim. Engr.

Oct-03
Jan-06

$125,000

Approved

Design

Feb-06
Jan-07
$255,000

Approved

Construction

Feb-07
Dec-09

$4,120,000

Future

Prior Authorization:

$4,500,000

2008 Budget Adjustment:

$0

Total 2008 Authorization:

$4,500,000

Future Authorizations:

$0

Total Project Cost:

$4,500,000

return to top

   Projected Cash Flow:

Authorized

Future

Total

Prior to 2008
$1,026,000
$0
$1,026,000
2008 Budget
  2,000,000
0
  2,000,000
2009
500,000
0
500,000
2010
0
0
0
2011
0
0
0
2012
0
0
0
2013
0
0
0
2014
0
0
0
2015
0
0
0
2016
0
0
0
2017
0
0
0
Post-2017
0
0
0
Contingency
974,000
0
974,000
Totals
$4,500,000
$0
$4,500,000

return to top

Impact on O&M Costs:

No significant increase to annual budget anticipated. The annual operation and maintenance cost for the replacement lift station is estimated at $77,000.