2008 - 2017 Capital Improvement Program

Project #8018, Blue Lake Plant Improvements  

Description:

This project consists of replacing the existing gaseous chemical effluent disinfection system with  liquid chemical disinfection; modifying the existing aeration tanks and solids handling facilities to  remove phosphorus; rehabilitation of facilities nearing the end of their useful life; improvements to  the solids processing facilities and odor control; the addition of anaerobic sludge digestion to  supplement the existing sludge dryer for reliability and capacity; and improvements to plant utility  systems, including standby power. The project also includes the staged expansion of the plant's  capacity.

Project Map

Click here to view the project's location map

Purpose and Justification:

In addition to meeting the regulatory requirements of the NPDES permit, the improvements provide the additional treatment capacity to meet long term service needs of the service area.

return to top

Project Authorization:

Project Schedule

Authorizations

Start

End

Funding

Status

Prelim. Engr.

Jan-03
Sep-06

$800,000

Approved

Design

Feb-06
Oct-08
$11,200,000

Approved

Construction

Jun-07
Dec-13

$209,000,000

Approved

Prior Authorization:

$221,000,000

2008 Budget Adjustment:

$0

Total 2008 Authorization:

$221,000,000

Future Authorizations:

$0

Total Project Cost:

$221,000,000

return to top

   Projected Cash Flow:

Authorized

Future

Total

Prior to 2008
$14,004,000
$0
$14,004,000
2008 Budget
17,000,000
0
  17,000,000
2009
36,000,000
0
36,000,000
2010
46,000,000
0
46,000,000
2011
48,000,000
0
48,000,000
2012
30,000,000
0
30,000,000
2013
3,900,000
0
3,900,000
2014
0
0
0
2015
0
0
0
2016
0
0
0
2017
0
0
0
Post-2017
0
0
0
Contingency
26,096,000
0
26,096,000
Totals
$221,000,000
$0
$221,000,000

return to top

Impact on O&M Costs:

The plant's O&M costs will increase by approximately $120,000 annually due to the conversion to liquid chemical disinfection. Other plant O&M costs will increase as capacity is increased. Annual solids processing O&M costs will be reduced by over $1,000,000 with the addition of anaerobic digestion prior to heat drying, due primarily to energy cost savings, but total annual O&M costs will increase with increasing wastewater flow and solids production.