2011 - 2016 Capital Improvement Program

Project #8047, Plymouth Forcemain Improvements  

Description:

This project consists of the rehabilitation of portions of the Plymouth forcemain using cured-in-place-pipe (CIPP) technology, along with other repairs as needed.

Project Map

Click here to view the project's location map

Purpose and Justification:

The Plymouth lift station is served by two forcemains. The 30 inch steel forcemain was constructed in 1970 along with the pump station. In the late 1980's a 36 - 42 inch ductile iron forcemain was installed to handle all the flow from the pump station. Portions of the Plymouth Forcemain act as a gravity sewer and never flow full. These portions of the forcemain experience are severely deteriorated by hydrogen sulfide. To ensure reliable service, the forcemain requires rehabilitation.

return to top

 

Project Authorization:

Project Schedule

Authorizations

Start

End

Funding

Status

Prelim. Engr.

Jan-05 Mar-06
$230,000
Approved

Design

Jun-06 May-07
$365,000
Approved

Construction

Jun-07 Dec-11

$7,405,000

Approved

Prior Authorization:

$8,000,000

2011 Budget Adjustment:

$0

Total 2011 Authorization:

$8,000,000

Future Authorizations:

$0

Total Project Cost:

$8,000,000

return to top

   Projected Cash Flow:

Authorized

Future

Total

Prior to 2011
$4,868,000
$0
$4,868,000
2011 Budget
  2,500,000
0
2,500,000
2012
0
0
0
2013
0
0
0
2014
0
0
0
2015
0
0
0
2016
0
0
0
2017 - 2021
0
0
0
2022 - 2026
0
0
0
Contingency
632,000
0
632,000
Totals
$8,000,000
$0
$8,000,000

return to top

Impact on O&M Costs:

The impact will generally be minor due to the rehabilitation nature of the project.

return to top

 

 